How to Write a Contractor Estimate (With an Annotated Sample)

By Roy, Founder of Nailed. Published . 9 min read.

Nailed writes the quote from a voice note you send from the truck. Try it free

A good estimate answers five things before the client asks: what you'll do, what it costs, what's not included, when they pay, and how long the price holds. Everything else is layout. Below is one full sample for a small bathroom remodel, with the reason behind each part.

What goes into a contractor estimate?

Seven things: the client and job address, a scope in plain words, line items with quantity, unit and price, a markup, allowances, exclusions, and a payment schedule with a validity date. Skip one and you will pay for it later, usually on a day the client says "I thought that was included."

Here's the job. A 5 by 8 hall bath: tear out the tub surround and floor, set new tile, replace the vanity and fixtures, rough-in plumbing and electrical, paint.

What does the sample estimate look like?

Estimate for the Alvarez hall bath, 118 Marsh Lane Valid through November 30, 2026

A. Labor and subs

#ItemQtyUnitUnit priceAmount
1Demo and tear-out16hr$65.00$1,040.00
2Backer board, blocking, framing fixes14hr$65.00$910.00
3Tile setting, floor and shower120sq ft$16.00$1,920.00
4Paint and caulk1lot$520.00$520.00
5Plumbing rough-in and set fixtures (licensed sub)1lot$1,650.00$1,650.00
6Electrical, fan and vanity light (licensed sub)1lot$780.00$780.00
Labor and subs subtotal$6,820.00

B. Materials

#ItemQtyUnitUnit priceAmount
7Cement backer board8sheet$16.50$132.00
8Waterproofing membrane kit1kit$285.00$285.00
9Tile, allowance120sq ft$6.00$720.00
10Vanity with top, allowance1ea$900.00$900.00
11Faucet, shower trim, accessories, allowance1lot$650.00$650.00
12Thinset, grout, fasteners, sundries1lot$248.00$248.00
13Dumpster, 10 yd, one pull1ea$425.00$425.00
Materials subtotal$3,360.00

C. Totals

Amount
Direct cost (A + B)$10,180.00
Overhead and profit, 20% of direct cost$2,036.00
Subtotal$12,216.00
Permit fee, at cost$185.00
Contract total$12,401.00

D. Payment schedule

PaymentWhenAmount
DepositAt signing$1,200.00
Draw 1Demo and rough-in plumbing and electrical done$4,000.00
Draw 2Tile set and grouted$4,000.00
FinalPunch list done, walkthrough$3,201.00
Total$12,401.00

E. Exclusions: Mold or rot found behind walls, asbestos or lead testing and abatement, moving or replacing the main drain stack, structural changes, painting outside the bathroom, any item not listed above.

F. Terms: Allowances are a set dollar amount. Selections above the allowance are added by written change order. Price is valid through November 30, 2026.

The math checks. Labor and subs: 1,040 + 910 + 1,920 + 520 + 1,650 + 780 = 6,820. Materials: 132 + 285 + 720 + 900 + 650 + 248 + 425 = 3,360. Together 10,180. Twenty percent of that is 2,036. Add the 185 permit and you get 12,401. The four payments add to the same figure: 1,200 + 4,000 + 4,000 + 3,201 = 12,401.

Why is labor split from materials?

Because they behave differently. Labor is your hours and your subs' quotes. Materials move with the supplier and the week. Splitting them lets you see which one blew up when a job runs over, and it lets you re-price one without touching the other.

Every line carries a quantity and a unit. "Tile setting, 120 sq ft at $16" can be checked. "Tile work, $1,920" can only be argued with. If the client later adds 20 square feet, the change order writes itself: 20 times $16.

Hours at $65 on lines 1 and 2 are your crew's loaded rate (wages, insurance, payroll costs), not what you pay a helper. If you're not sure what your loaded rate is, that is the first number to work out before you write another estimate. It's most of the difference between a job that pays and a job that just keeps you busy. More on that in general contractor profit margin.

How do you add markup to a construction estimate?

Add it as a percentage of direct cost, on purpose, and know what margin it gives you. In the sample, 20 percent markup on $10,180 is $2,036. That is a margin of 16.67 percent on the $12,216 subtotal, not 20. Markup and margin are different, and mixing them up is how contractors think they make 20 and make 16.

The markup pays for what the lines don't: your phone, insurance, truck, the day you spend selling and the day you spend on the punch list. It also leaves room for the profit. Show it as one line, as above, so you aren't re-pricing every row when the client asks for a discount.

The permit is at cost, outside the markup. That's a choice. Whichever way you go, write it down.

What is an allowance, and how do you set one?

An allowance is a dollar figure for something the client hasn't chosen yet. In the sample, tile at $6.00 a square foot, a $900 vanity and $650 of fixtures. Without them you'd either guess a finish and be wrong, or leave the line blank and quote nothing.

Set the figure at a realistic mid-range, not the cheapest option. A low allowance wins the bid and loses the job: the client falls in love with a $14 tile and sees a $960 increase. Then say, in the terms, that anything above is added by change order. Getting change orders signed covers how to make that easy.

What should exclusions say?

They should list what the client might reasonably assume is covered and isn't. Rot behind the shower wall is the classic. You can't see it, you can't price it, and you shouldn't absorb it. Say so in the estimate, before the wall opens.

Be specific. "Hidden conditions" is vague. "Mold or rot found behind walls, priced separately when found" tells the client what happens next. End with "any item not listed above". It's a one-line catch-all and it has saved a lot of arguments.

How do you set the payment schedule?

Tie every payment to something the client can see, and keep it close to your costs. The sample front-loads draw 1 after demo and rough-in, because that's when your sub bills you. Keep the last payment big enough to matter while a punch list is open: here it's $3,201, about a quarter of the job.

The deposit of $1,200 is under 10 percent of the price. Some states cap it. California, for example, limits a down payment to the lesser of $1,000 or 10 percent of the price, so on this job that rule would trim $200. Check yours. Our guide on how much deposit a contractor can ask for covers three states with the statutes, and the contractor payment schedule template has more layouts.

Put the remainder on the last payment, not on a rounded draw. That's how the schedule sums exactly.

How long should an estimate be valid?

Fourteen to thirty days (the full breakdown by job type has the table and wording). Prices move and so does your calendar, and an open-ended quote is a free option for the client. Print the date on the estimate ("valid through November 30, 2026") and say what happens after: you re-check the price. The sample does this in its header and again in the terms.

What does California require in the contract?

It's a useful yardstick even if you work elsewhere, because it's written out. California's home improvement contract rules require the work and significant materials to be described, the price stated in dollars and cents, a schedule of progress payments tied to the work, and changes made in writing and signed. The estimate above covers the same ground, which makes it easy to turn into a contract. Your state may differ. Read the statute and ask a local attorney. For a full document, use the construction proposal template.

Where can you start from a template?

If your job is a kitchen or a bath, start with a filled one and change the numbers: the kitchen remodel estimate and the bathroom remodel estimate. Using a tool to type it up is fair game. Here's what AI is and isn't good at when it writes quotes.

Not sure what number goes on the estimate? How to price a remodeling job walks through costs, overhead and profit with a worked example.

Want a first draft fast? Paste your walkthrough notes into the free quote maker and get a quote PDF with a deposit schedule, no sign-up. You still add the exclusions and the valid-until date.

Where does Nailed fit?

Nailed is an AI office manager you text on Telegram or WhatsApp. You say the job and your prices, it drafts the estimate with the totals done in code, and nothing goes to the client until you tap Send. It also chases the signature and the deposit. It doesn't price your work, and it doesn't replace a site walk. If you'd rather keep your sheet, the sample above works fine as one. See how it works and pricing, or read about the AI office manager for contractors.

Once the estimate is out, follow up without nagging with the quote follow-up messages. To get it signed, read about e-signatures on construction contracts. If you are choosing how to charge, see fixed price vs time and materials vs cost plus.

Frequently asked questions

How detailed should a contractor estimate be?

Detailed enough that the client can see what's in the price and you can prove what wasn't. Break out labor, materials, subs and allowances, give quantities and units, and list exclusions. You don't need every screw. Put small stuff in one line, like thinset, grout and fasteners.

Should I show my markup on the estimate?

Either works, but be consistent. Some contractors fold markup into every line. Others show one 'overhead and profit' line. A single line is easier to explain, and easier to defend when the client asks for a discount. Never apply it to a pass-through like a permit fee unless you've said so.

How long should an estimate be valid?

Short. 14 to 30 days is common, because material prices and your schedule both move. Print the date on the estimate and say what happens after it: the price is re-checked.

What's the difference between an estimate and a contract?

An estimate is your price for a defined scope. A contract is what both sides sign. Many states have specific content rules for home improvement contracts, such as California, which requires the work, the price and a progress payment schedule to be stated. Check your state and ask an attorney if you're unsure.

What is an allowance and why use one?

An allowance is a set dollar amount for something the client hasn't picked yet, like tile or a vanity. It lets you quote the job now. If the client chooses something that costs more, the difference is added by change order. Write that rule on the estimate.