How Long Should a Contractor Estimate Be Valid?
Nailed writes the quote from a voice note you send from the truck. Try it free
A contractor estimate should be valid for 14 to 30 days, and never longer than your shortest supplier price hold on the job. If lumber is held for 14 days, a 30-day quote means you are paying for the extra 16 days out of your margin. Print the date on the quote and say what happens after it.
Why do estimates expire at all?
Because prices move and your calendar fills up. An estimate with no end date is a free option for the client: they can wait six months, watch the price of materials double, and still ask for the old number. A date puts a limit on your promise.
It also helps the follow-up. A valid-through date is an honest reason to message the client before it lapses. The quote follow-up messages page has wording for that.
How long should a contractor estimate be valid?
Thirty days is a sensible default. Use 14 when materials are volatile or you are buying from a supplier whose quote expires sooner. Use 60 or more only for work you can price from your own labor with little material in it. Never promise a date past your shortest supplier hold.
How do you pick the date from supplier quotes?
Take the shortest hold among the suppliers on the job, count from the date they quoted you, and subtract a few days of buffer for your own sending and the client's decision. That date, or the standard 30 days if it is sooner, goes on the quote.
Here is a worked example. A $27,400 addition-and-windows job. Your lumber supplier held its price for 14 days from Nov 9. The window supplier held its price for 30 days from Nov 9. You send the quote on Nov 12.
| Supplier | Quoted on | Hold | Price holds through |
|---|---|---|---|
| Lumber | Nov 9 | 14 days | Nov 23 |
| Windows | Nov 9 | 30 days | Dec 9 |
The shortest hold ends Nov 23. Take off three days of buffer and the quote reads valid through November 20, 2026, eight days after you send it. Eight days is short for a $27,400 decision. So either you ask the lumber supplier for a longer hold, or you carry a price-adjust line for lumber (see the wording below). Don't quietly give the client 30 days and eat the difference.
What validity window fits which kind of job?
There is no standard. These are starting points, not a standard, and they bend with your market.
| Job type | Material exposure | Typical window | Why |
|---|---|---|---|
| Painting, drywall repair | Low (labor-heavy) | 30 to 60 days | Paint prices move slowly |
| Kitchen or bath remodel | Medium (cabinets, tile, fixtures) | 30 days | Lead times matter more than price |
| Deck, fencing, framing | High (lumber) | 7 to 14 days | Lumber can move weekly |
| Roofing | High (shingles, tear-off fees) | 14 to 30 days | Supplier price lists update on a schedule |
| Windows, doors, special order | Medium to high | Supplier's hold minus 3 days | You inherit their deadline |
| Large addition or whole-house | Mixed | 14 to 30 days, with a price-adjust line | One date rarely fits every supplier |
What should the expiry clause say?
Short, in plain words, on the quote near the total. Copy one of these and change the date.
-
Plain: This quote is valid through [date]. After that date the price may change.
-
With re-check: This quote is valid through [date]. After that date we will re-check material prices and send an updated quote before any work is scheduled.
-
With a materials adjustment: This quote is valid through [date]. Material prices are held by suppliers until [earlier date]. If you sign after that, the cost of [lumber / windows] will be adjusted to the supplier's current price and shown to you in writing before work starts.
-
With a courtesy extension: This quote is valid through [date]. If you need more time, ask us before that date and we will re-check prices and extend it where we can.
Wording 3 is the one that helps most on jobs with a short-hold material. Wording 4 gives a nervous homeowner an easy yes. Whichever you use, make sure the date also appears next to the total, not just in the fine print.
What if the client comes back after the quote expired?
You have three choices: honor the old price, re-quote, or re-quote with a price-adjust line. Honor it when prices barely moved and the client is worth keeping. Re-quote when anything material changed.
Here is a re-quote, using the same $27,400 job. It was built at a 25 percent markup on cost.
| Line | Original (Nov 12) | Client returns Jan 11 |
|---|---|---|
| Lumber | $4,100 | $4,510 |
| Windows | $6,200 | $6,200 |
| Other materials | $3,620 | $3,620 |
| Labor and subs | $8,000 | $8,000 |
| Cost | $21,920 | $22,330 |
| Price at 25% markup | $27,400.00 | $27,912.50 |
Lumber rose $410, about 10 percent. At a 25 percent markup that becomes $512.50 on the price, not $410. Your margin on the original job was 20 percent ($5,480 on $27,400). If you honored the old price on the new costs, you would earn $5,070, or about 18.5 percent. That is the cost of being nice. Maybe it is worth it. Make it a choice. The markup and margin calculator does this arithmetic if you want to check yours.
If the window supplier's price also moved, say to $6,450, the new price is $28,225, up $825.
Can you raise the price after the client signs?
Not because the quote expired. Expiry covers the offer, not the contract. Once the client signs, you are bound to the price in the signed document, unless it has an escalation clause that says otherwise or the scope changes. Scope changes go through a change order, and the pricing guide shows how.
So the cleanest moment to protect yourself is before the signature: a short window, a date next to the total, and, on material-heavy jobs, a clause like wording 3.
Where Nailed fits
Nailed does not watch your suppliers' prices. You still ask them. What it does is draft the quote from your voice note, carry a valid-until date on the PDF, and let the client e-sign from a link. The totals are done in code, and nothing goes out until you tap Send.
- You: Quote Kessler addition, 27,400. Valid through Nov 20, lumber price is only held till the 23rd.
- Nailed: Drafted the Kessler quote for $27,400.00, valid through Nov 20, 2026. Tap Send to go to the client.
- You: Send it
- Nailed: Sent. Kessler can sign from the link.
To see how a quote becomes a signed job, read how it works and the AI office manager for contractors. For the rest of the estimate itself, start with how to write a contractor estimate, and see estimate vs quote vs bid vs proposal for what each word promises.
Frequently asked questions
Can a contractor raise the price after an estimate expires?
Yes, on an estimate the client never accepted. An expired quote is an offer that lapsed, so you can re-price it. You cannot raise a signed contract on your own unless the contract has an escalation clause. Check your state's rules and read your own paperwork.
Is a contractor estimate legally binding?
An estimate is usually a rough number. A written quote that the client signs becomes a contract. What binds you depends on the wording and your state. Putting a valid-through date and the word 'quote' or 'estimate' on the page makes your intent clear.
What if the homeowner comes back after 60 days?
Treat it as a new quote. Reconfirm the scope, ask your suppliers for current prices, and send a fresh version with a new date. If prices barely moved, honor the old number and say you are doing them a favor, in writing.
Should the valid-until date go on the estimate or in the email?
On the estimate itself. The email gets deleted, and the PDF is what gets printed and signed. Put the date near the total and repeat it in the terms line. That way there is no argument about which date applied.