How to Quote a Kitchen Remodel (Worked Example)
Nailed writes the quote from a voice note you send from the truck. Try it free
To quote a kitchen remodel, list every piece of scope with a quantity and a price, set allowances for what the client hasn't picked, write down what's not included, and tie each payment to a milestone. The quote is the scope, the math and the fine print on one page. Below is the order that works, with a worked example. The numbers are made up, so use your own rates.
What do you need before you can quote a kitchen?
A measured room, a scope you can say in two sentences, and a list of what the client is choosing versus what you are choosing. Measure walls, the cabinet run in linear feet, counter square footage and floor area. Photograph the panel, the sink wall and the ceiling.
Ask three questions on site: who buys the appliances, who picks the cabinets and counters, and does anything structural move. Those three answers decide most of the exclusions. Write the answers into your notes while you're standing there.
How do you build the line items?
Go trade by trade, and give each line a quantity, a unit and a unit price. Use lump sums only where a count makes no sense, like demo. "Kitchen remodel, $29,000" with no lines invites the question of what's in it.
Here is a worked example, a 10x12 kitchen with stock cabinets where the owner buys the appliances. Made-up numbers, not a price guide.
| Item | Qty | Unit | Unit price | Amount |
|---|---|---|---|---|
| Demo and haul-away | 1 | LS | $2,900.00 | $2,900.00 |
| Relocate outlets | 5 | ea | $185.00 | $925.00 |
| Recessed lights, supply and install | 8 | ea | $160.00 | $1,280.00 |
| Plumbing rough-in change | 1 | LS | $1,600.00 | $1,600.00 |
| Drywall patch and skim | 250 | sf | $4.50 | $1,125.00 |
| Cabinets, supply (ALLOWANCE) | 1 | LS | $11,800.00 | $11,800.00 |
| Cabinet install | 20 | lf | $140.00 | $2,800.00 |
| Countertop (ALLOWANCE) | 36 | sf | $80.00 | $2,880.00 |
| Tile backsplash | 28 | sf | $26.00 | $728.00 |
| Flooring, supply and install | 150 | sf | $8.75 | $1,312.50 |
| Paint | 1 | LS | $1,300.00 | $1,300.00 |
| Permit fee | 1 | LS | $400.00 | $400.00 |
| Total | $29,050.50 |
Check one: 250 sf at $4.50 is $1,125.00, and 150 sf at $8.75 is $1,312.50. The twelve lines add to $29,050.50. For a copy-paste layout with the clauses written out, use the kitchen remodel estimate template.
How do allowances work on a kitchen quote?
An allowance is a set amount in the price for something the client hasn't picked yet. They shop, and if the pick costs more they pay the difference, if less they get a credit. Put that sentence on the quote, or the overage becomes your problem.
Keep cabinet supply and cabinet install apart. When the client downgrades the cabinets, the install line shouldn't move. And be honest with the number: a low allowance wins the bid and loses the profit when the client falls for the better door.
What should you leave out of the price?
Whatever you can't see or didn't price, in plain words, under "Exclusions". For a kitchen that usually means:
- Appliances, unless you're supplying them
- Moving a wall or adding a beam
- Rot, old wiring or plumbing that fails code once the wall is open
- Asbestos or lead testing and removal
- Anything not on the line items
An exclusion only protects you if the client saw it before signing. Point at it when you hand over the quote.
How should you split the payments?
Tie each draw to something the client can see. This example uses 10, 40, 30 and the rest on the $29,050.50 total, with the rounding remainder on the last payment.
| Draw | When | Amount |
|---|---|---|
| 1 | At signing (10%) | $2,905.05 |
| 2 | Cabinets delivered (40%) | $11,620.20 |
| 3 | Countertop template (30%) | $8,715.15 |
| 4 | Completion (remainder) | $5,810.10 |
| Total | $29,050.50 |
Several states cap the deposit a contractor can take, so check your own rules first. This is general information, not legal advice. The payment schedule template has more splits, and how much deposit a contractor can ask for covers the limits.
Can you turn your walkthrough notes into the quote?
Yes, and it saves the retyping. Write the notes on site, a price on each item, then paste them into the free quote maker. It builds the lines, adds them in code and gives you a PDF with a deposit schedule. No sign-up.
Notes like these work fine, shorthand included:
Chen kitchen, 10x12, owner buys appliances. Demo and haul 2,900 Move 5 outlets at 185 8 recessed lights at 160 Plumbing change 1.6k Cabinets allowance 11.8k, install 20 lf at 140 Counters allowance 36 sf at 80 Backsplash 28 sf at 26 Floor 150 sf at 8.75 Paint 1300 Permit 400
Read the result before you send it. Add your exclusions and the valid-until date, which the PDF won't know. If you'd rather have the quote, the e-signature and the payment follow-ups in one place, that's Nailed, with 14 days free and no card. See pricing.
Pricing the job itself, not just writing it up? Read how to price a remodeling job and fixed price vs time and materials vs cost plus first.
Frequently asked questions
How do you quote a kitchen remodel?
Walk the job, write down every scope item with a quantity, price each line, mark what the client hasn't chosen as an allowance, list what you left out, and split the payments. Then add up the lines in a tool, not in your head, and read the total twice.
What do you include in a kitchen remodel quote?
Demo, electrical, plumbing, drywall, cabinets, countertops, backsplash, flooring, paint, appliance install, dumpster and permit. Then the parts people forget: allowances, exclusions, a payment schedule, how changes are handled and how long the price is good for.
How do you quote when the client hasn't picked cabinets yet?
Use an allowance. Put a set amount for cabinet supply in the price, keep install on its own line, and write that any difference between the client's pick and the allowance is added or credited by written change order before you order.
How much should I add for surprises behind the wall?
Either a visible contingency line you credit back if unused, or no contingency and a clause that hidden conditions are priced by change order when found. Pick one and write it down. Whatever you pick, price the problem in writing before you fix it.
Can I make a kitchen quote from my walkthrough notes?
Yes. Paste the notes, with a price on each item, into the free quote maker and it builds the lines, the total and a deposit schedule as a PDF. You still review it and add your exclusions before it goes to the client.