Kitchen Remodel Estimate Template With Cabinet Example
Nailed writes the quote from a voice note you send from the truck. Try it free
This is a kitchen remodel estimate for contractors: the document you send the homeowner, with real line items, quantities and units. Copy the template, then check the filled 10x12 example, where every total and every payment adds up to the cent. Prefer a spreadsheet? Download the example as a CSV (it has the formulas, so change a quantity and the total follows).
What goes into a kitchen remodel estimate?
Scope by trade, each line with a quantity and a price. Then the parts people forget: allowances, exclusions, permits, a payment schedule, how changes work, and how long the price is good for.
A clean category list:
- Demolition and haul-away
- Electrical (circuits, outlets, lighting)
- Plumbing (rough-in changes, fixtures hookup)
- Drywall and patching
- Cabinets (supply and install separately)
- Countertops
- Backsplash
- Flooring
- Paint
- Appliance install
- Dumpster and permit
- Allowances, exclusions, payment schedule, change-order clause
Split supply from install on cabinets. When a client downgrades the cabinets, you want the install line to stay put.
Copy-paste kitchen remodel estimate template
ESTIMATE #[number]
Date: [date] Valid until: [date, 14 to 30 days out] Contractor: [business name, phone, license # if your state requires one] Client: [name] Job address: [address]
SCOPE OF WORK [Two or three sentences. Room size, what comes out, what goes in, who supplies what.]
LINE ITEMS Item | Qty | Unit | Unit price | Amount Demo and haul-away | [1] | LS | $[ ] | $[ ] Electrical: [outlets, circuits, lights] | [ ] | [ea] | $[ ] | $[ ] Plumbing: [rough-in changes] | [1] | LS | $[ ] | $[ ] Drywall patch and finish | [ ] | sf | $[ ] | $[ ] Cabinets, supply (ALLOWANCE) | 1 | LS | $[ ] | $[ ] Cabinet install | [ ] | lf | $[ ] | $[ ] Countertop (ALLOWANCE) | [ ] | sf | $[ ] | $[ ] Backsplash tile, install | [ ] | sf | $[ ] | $[ ] Flooring, supply and install | [ ] | sf | $[ ] | $[ ] Paint | [1] | LS | $[ ] | $[ ] Appliance install | [1] | LS | $[ ] | $[ ] Dumpster | [1] | LS | $[ ] | $[ ] Permit fee | [1] | LS | $[ ] | $[ ] TOTAL: $[ ]
ALLOWANCES Items marked ALLOWANCE are placed at the amount shown. If the client's final selection costs more, the difference is added by written change order before ordering. If it costs less, the difference is credited.
EXCLUSIONS (not in this price) Appliances (owner supplies). Structural changes, moving walls or beams. Hidden conditions behind walls and under floors: rot, old wiring, plumbing that doesn't meet code. Asbestos or lead testing and abatement. Anything not listed above.
PERMITS [Included as a line above / the owner pulls the permit / not required in this jurisdiction.]
PAYMENT SCHEDULE 10% at signing: $[ ] 30% at start of cabinet install: $[ ] 30% at countertop template: $[ ] Balance at completion: $[ ]
CHANGES Any change to scope, price or schedule is agreed in writing, signed by both sides, before the work starts.
This estimate is good until [date]. It becomes a contract when both sides sign below.
Client: ______________________ Date: ________ Contractor: __________________ Date: ________
Not sure how to word a mid-job change? Use the change order template. Need the full contract language, clause by clause? See the construction proposal template.
What does a filled-in kitchen estimate look like?
A 10x12 galley kitchen. Stock cabinets, owner buys the appliances. These are made-up numbers to show the layout and the math. They are not a price guide, so use your own rates.
| Item | Qty | Unit | Unit price | Amount |
|---|---|---|---|---|
| Demo and haul-away (cabinets, counters, floor) | 1 | LS | $3,400.00 | $3,400.00 |
| Relocate outlets | 4 | ea | $185.00 | $740.00 |
| Recessed lights, supply and install | 6 | ea | $165.00 | $990.00 |
| Dedicated 20A circuits | 2 | ea | $420.00 | $840.00 |
| Plumbing rough-in change, sink and dishwasher | 1 | LS | $1,850.00 | $1,850.00 |
| Drywall patch and skim | 320 | sf | $4.25 | $1,360.00 |
| Cabinets, supply (ALLOWANCE) | 1 | LS | $14,500.00 | $14,500.00 |
| Cabinet install | 24 | lf | $135.00 | $3,240.00 |
| Countertop, fabricate and install (ALLOWANCE) | 42 | sf | $85.00 | $3,570.00 |
| Tile backsplash | 30 | sf | $28.00 | $840.00 |
| LVP flooring, supply and install | 168 | sf | $9.50 | $1,596.00 |
| Paint, walls and trim | 1 | LS | $1,450.00 | $1,450.00 |
| Appliance install (owner supplies) | 1 | LS | $650.00 | $650.00 |
| Dumpster | 1 | LS | $650.00 | $650.00 |
| Permit fee | 1 | LS | $450.00 | $450.00 |
| Total | $36,126.00 |
Check one: 320 sf at $4.25 is $1,360.00. 168 sf at $9.50 is $1,596.00. The fifteen lines add to $36,126.00.
How do you write a kitchen cabinet estimate?
Cabinets are the biggest single line in most kitchens, so give them their own block. Price supply and install apart, and break the supply side into the pieces the client can point at. Here is what goes in:
- Boxes, base, wall and tall, priced per box or per linear foot
- Doors and drawer fronts, priced each (often a separate line from the box)
- Hardware: pulls, knobs, and hinges or slides if they aren't included
- Trim and fillers: crown molding, filler strips, end panels, toe kick
- Install labor, per linear foot of cabinet run
- Removal and disposal of the old cabinets, if it isn't already in your demo line
This is a stand-alone example for a different, made-up kitchen with a 24 linear foot run. The numbers show the layout and the math. They aren't a price guide, so use your quotes and your rates.
| Item | Qty | Unit | Unit price | Amount |
|---|---|---|---|---|
| Base cabinet boxes | 9 | ea | $420.00 | $3,780.00 |
| Wall cabinet boxes | 8 | ea | $360.00 | $2,880.00 |
| Tall pantry cabinet | 1 | ea | $890.00 | $890.00 |
| Shaker doors and drawer fronts, painted | 38 | ea | $95.00 | $3,610.00 |
| Pulls | 36 | ea | $9.50 | $342.00 |
| Crown molding | 22 | lf | $18.00 | $396.00 |
| Filler strips and end panels | 6 | ea | $75.00 | $450.00 |
| Cabinets, supply subtotal | $12,348.00 | |||
| Cabinet install | 24 | lf | $135.00 | $3,240.00 |
| Remove and dispose of old cabinets | 1 | LS | $600.00 | $600.00 |
| Cabinet estimate total | $16,188.00 |
Check it: $3,780 + $2,880 + $890 + $3,610 + $342 + $396 + $450 = $12,348. Add $3,240 install and $600 removal and you get $16,188.00.
On the main estimate, that supply subtotal is the number you'd carry as the cabinet allowance, and the install line stays separate.
What drives kitchen cabinet cost?
- Cabinet line. Stock, semi-custom and custom can differ by a lot for the same layout. Name the line and brand on the estimate.
- Door style and finish. A painted shaker front costs more than a plain slab. Say which one you priced.
- Run length and layout. More linear feet, more corners and more tall units all add boxes and install time.
- Trim. Crown, fillers and end panels get forgotten, then show up as a change order.
- Hardware. The client picks pulls at the store. Put a count and a per-piece price on the line.
- Site conditions. Walls that aren't plumb or floors that aren't level slow the install. Old cabinets that are glued, or that hide a surprise, slow the removal.
- Lead time. Cabinets can take weeks to arrive, and prices move. Keep the estimate valid for a short window.
How do allowances work, and who pays the difference?
An allowance is a set amount in the price for something the client hasn't picked yet. Cabinets and countertops are the usual ones. The client shops. If the pick comes in over, they pay the difference. If under, they get a credit. Write that sentence into the estimate.
The overage is a written change, not a favor. "We'll sort it out at the end" costs you money. The template wording above does the job: the difference is added by change order before you order.
What should you leave out of the price, and say so?
Anything you can't see or didn't price. Put it under "Exclusions" in plain words. A short list that covers most kitchens:
- Appliances, unless you're supplying them
- Structural work: moving a wall, adding a beam
- Hidden conditions: rot, old wiring, plumbing that fails code once opened
- Asbestos or lead testing and removal
- Anything not on the line items
An exclusion only helps you if the client saw it before they signed. Point at it when you hand over the estimate.
How do you handle hidden conditions behind the walls?
Pick one approach and write it down. Option one: a visible contingency line, a set sum the client sees and that you credit back if you don't use it. Option two: no contingency, and a clause that says hidden conditions are priced by change order when found.
Both are honest. Silently hoping the walls are fine is not. Whichever you pick, price any discovered problem before you fix it, in writing. The change order template covers it.
How should you split the payments on a kitchen?
Tie each draw to a milestone the client can see. This example uses 10/30/30/30 on the $36,126.00 total, with any rounding remainder on the last payment:
| Draw | When | Amount |
|---|---|---|
| 1 | At signing (10%) | $3,612.60 |
| 2 | Start of cabinet install (30%) | $10,837.80 |
| 3 | Countertop template (30%) | $10,837.80 |
| 4 | Completion (remainder) | $10,837.80 |
| Total | $36,126.00 |
Several states cap the deposit a contractor can take, so check your own rules before you set the first draw. More schedules, including a $60k job and a $190k job, are in the contractor payment schedule template.
How do you send it so it gets signed?
Make it easy to sign on a phone. A PDF the client has to print, sign and scan is a week of waiting. A link they tap, read and sign is an afternoon.
Nailed works this way today: you send a voice note and Nailed drafts the quote, you read it, tap to send, and your client gets an email with a signing link, no login. The AI doesn't do the math. Every price in the example below came from the contractor, and the totals came from code.
This is the first part of a kitchen, shortened. Made-up numbers again.
- You: Voice note (0:31): Kitchen for the Reyes family, 10 by 12. Demo and haul-away 3,400. Four outlets to move at 185 each. Six recessed lights at 165. Cabinets are an allowance, 14,500.
- Nailed: Got it. Draft quote, Reyes kitchen: Demo and haul-away: $3,400.00 Relocate outlets, 4 ea at $185.00: $740.00 Recessed lights, 6 ea at $165.00: $990.00 Cabinets, supply (ALLOWANCE): $14,500.00 Total so far: $19,630.00 What's next? I'll mark the allowance lines in the quote. Tap Send when it's done, or keep talking.
The point isn't the typing speed. Prices stay yours, and nothing reaches the client until you tap send. See how it works, or read the honest version of what AI can and can't do on an estimate.
Short on time? Paste your walkthrough notes into the free quote maker and get a quote PDF with the lines and a deposit schedule, no sign-up. The kitchen quoting guide has the step-by-step.
Does the estimate show my markup?
No. Keep it on your cost sheet. Each line the client sees already carries it. Before you send, run the totals through the markup and margin calculator so you know what the job really makes. Prices that look fine can still leave you thin, and the profit margin guide shows what remodelers actually keep.
Want the estimate, the signature and the payment follow-ups handled from your phone? That's what Nailed does for small contractors. Plans are on the pricing page.
If the kitchen scope is hard to pin down, read fixed price vs time and materials vs cost plus before you pick how to charge.
Frequently asked questions
Should a kitchen estimate be itemized or one number?
Itemize it. A lump sum invites the question of what's in it, and the answer lives in your head. Lines with a quantity, a unit and a price let the client see the scope and let you point to a line when they ask for more.
How long should the estimate be valid?
Short. 14 to 30 days is common, because lumber, tile and countertop prices move. Write the date on the estimate itself, and say the price needs a signed contract to hold after that date.
Do I put my markup on the estimate?
No. Show price lines only. Your markup lives in your cost sheet, and each customer-facing line already includes it. If you want to check what a markup does to your margin, use the markup and margin calculator.
Is an estimate binding?
It depends on your wording and your state. Say plainly whether the document is an estimate or a fixed price, and what it takes to turn it into a contract. Ask a local attorney if you're unsure. This isn't legal advice.
What's the difference between an allowance and a contingency?
An allowance is a set amount for something the client hasn't picked yet, like cabinets. A contingency is money held back for things nobody can see yet, like rot behind a wall. Allowances are about choices. Contingencies are about surprises.