Bathroom Remodel Estimate Template (Filled Example, Allowances)

By Roy, Founder of Nailed. Published . 8 min read.

Nailed writes the quote from a voice note you send from the truck. Try it free

This is a bathroom remodel estimate for contractors, built around the wet-area work that thin templates skip: waterproofing, backer board, the valve, the drain. Copy the template, then read the filled 5x8 hall bath where every total is checked. Want it in a spreadsheet? Download the example as a CSV with the formulas in.

What goes into a bathroom remodel estimate?

Demo, rough plumbing, electrical, waterproofing, backer board, tile labor, tile material, fixtures, vanity, glass, paint, permit and haul-away. Then allowances, exclusions, payments and a change clause. The wet-area lines are the ones that decide whether you made money.

Checklist of lines:

  • Demo and haul-away
  • Plumbing: valve, drain, rough-in, venting if it changes
  • Electrical: GFCI, exhaust fan, vanity light
  • Waterproofing: shower pan, membrane, niche
  • Backer board
  • Wall tile labor, wall tile material (allowance)
  • Floor tile labor
  • Vanity and top, toilet and fixtures, glass door (allowances)
  • Vanity install and plumbing connect
  • Paint and trim
  • Dumpster and permit

Copy-paste bathroom remodel estimate template

Bathroom remodel estimate (copy and fill in)

ESTIMATE #[number]

Date: [date] Valid until: [date, 14 to 30 days out] Contractor: [business name, phone, license # if your state requires one] Client: [name] Job address: [address]

SCOPE OF WORK [Size of room. What comes out (tub, vanity, tile). What goes in (shower, door, vanity). Who supplies what.]

LINE ITEMS Item | Qty | Unit | Unit price | Amount Demo and haul-away | 1 | LS | $[ ] | $[ ] Plumbing: [valve, drain, rough-in] | 1 | LS | $[ ] | $[ ] Electrical: [GFCI, fan, light] | 1 | LS | $[ ] | $[ ] Waterproofing, [shower pan membrane] | 1 | LS | $[ ] | $[ ] Backer board, supply and install | [ ] | sf | $[ ] | $[ ] Wall tile, labor | [ ] | sf | $[ ] | $[ ] Wall tile material (ALLOWANCE at $[ ]/sf) | [ ] | sf | $[ ] | $[ ] Floor tile, install | [ ] | sf | $[ ] | $[ ] Vanity and top (ALLOWANCE) | 1 | LS | $[ ] | $[ ] Vanity install, plumbing connect | 1 | LS | $[ ] | $[ ] Toilet and fixtures (ALLOWANCE) | 1 | LS | $[ ] | $[ ] Glass shower door (ALLOWANCE) | 1 | LS | $[ ] | $[ ] Paint and trim | 1 | LS | $[ ] | $[ ] Dumpster and permit | 1 | LS | $[ ] | $[ ] TOTAL: $[ ]

ALLOWANCES Items marked ALLOWANCE are priced at the amount shown. If the client's selection costs more, the difference is added by written change order before ordering. If it costs less, the difference is credited.

EXCLUSIONS (not in this price) Repair of rotted or damaged subfloor, framing, or drain and supply lines found after demo. Moving walls. Asbestos or lead testing and removal. Mold remediation. Anything not listed above.

HIDDEN CONDITIONS If we find a condition we couldn't see before demo, we stop, show it to you, give you a written price to fix it, and wait for your signature before continuing.

PAYMENT SCHEDULE 10% at signing: $[ ] 30% at start of demo: $[ ] 30% when tile is set: $[ ] Balance at completion: $[ ]

This estimate is good until [date]. It becomes a contract when both sides sign below.

Client: ______________________ Date: ________ Contractor: __________________ Date: ________

For the full contract wording around this, see the construction proposal template. Working on an outdoor or exterior job instead? There are estimate templates for a deck, a roof and interior painting.

What does a filled-in bathroom estimate look like?

A 5x8 hall bath. Tub comes out, tiled shower with a glass door goes in. Made-up numbers to show structure and math. They aren't a price guide, so put your own rates in.

ItemQtyUnitUnit priceAmount
Demo (tub, vanity, tile), haul-away1LS$1,450.00$1,450.00
Plumbing: new valve, drain, rough-in1LS$2,100.00$2,100.00
Electrical: GFCI, fan, vanity light1LS$980.00$980.00
Waterproofing, shower pan membrane1LS$1,150.00$1,150.00
Backer board, supply and install90sf$6.50$585.00
Wall tile, labor90sf$24.00$2,160.00
Wall tile material (ALLOWANCE at $6.00/sf)90sf$6.00$540.00
Floor tile, install40sf$22.00$880.00
Vanity and top (ALLOWANCE)1LS$1,400.00$1,400.00
Vanity install, plumbing connect1LS$420.00$420.00
Toilet and fixtures (ALLOWANCE)1LS$1,100.00$1,100.00
Glass shower door (ALLOWANCE)1LS$1,250.00$1,250.00
Paint and trim1LS$520.00$520.00
Dumpster and permit1LS$780.00$780.00
Total$15,315.00

Spot check: 90 sf at $6.50 is $585.00. 90 sf at $24.00 is $2,160.00. Fourteen lines, $15,315.00.

How do you price tile: labor, material and waterproofing separately?

Three separate lines. Waterproofing and backer board go first because they go behind the tile and nobody sees them again. Labor to set the tile is next, priced per square foot. The tile itself is an allowance.

Why split them? When the client picks a $14/sf tile over your $6 allowance, only the material line moves. Your labor and waterproofing stay put. And when the client asks to cut cost, the line items show them that waterproofing isn't where to cut. Smaller tile or a tricky layout? Raise the labor line. It takes longer to set.

Which items should be allowances?

Whatever the client picks and you don't control: tile, vanity and top, toilet and fixtures, glass door. Use this sentence under the table:

Items marked ALLOWANCE are priced at the amount shown. If your selection costs more, we add the difference by written change order before ordering. If it costs less, we credit you.

Per-square-foot allowances (like the tile at $6.00/sf above) are easier to defend than a lump sum. The client can take the number to a tile shop and know where they stand.

What surprises show up behind a bathroom wall?

Rotted subfloor around the tub. A cast iron drain that's cracked. Galvanized supply pipe that's mostly rust. Wall framing that isn't plumb. You can't price these before demo, so say that in the estimate.

Two things protect you. List subfloor and plumbing repair under exclusions. Add the hidden-conditions clause from the template, which makes you stop, show the problem and get a signed price before you fix it. Then use a change order for the fix. How to get it signed before the work, not after: get change orders signed.

How do you schedule payments on a small job?

Fewer draws, each tied to a milestone. This example uses 10/30/30/30 on the $15,315.00 total, with any remainder on the last draw:

DrawWhenAmount
1At signing (10%)$1,531.50
2Start of demo (30%)$4,594.50
3Tile set (30%)$4,594.50
4Completion (remainder)$4,594.50
Total$15,315.00

On a job this size, three draws can be enough. Some states cap the deposit, so check yours before you set draw one. The contractor payment schedule template has more examples.

How does the estimate become a signed contract?

The client signs. That's it. Make it a link they can tap on a phone, not a PDF they print and scan.

With Nailed, you describe the job in a voice note and it drafts the quote. You check it, tap send, and your client gets an email with a signing link, no login needed. You set every price and the total comes from code, not the AI. Here is a shortened bathroom, with made-up numbers.

Nailed on WhatsApp
  1. You: Voice note (0:24): Hall bath for the Okafors. Shower pan waterproofing 1,150. Backer board 90 feet at 6.50. Wall tile labor 90 feet at 24.
  2. Nailed: Got it. Draft quote, Okafor hall bath: Waterproofing, shower pan membrane: $1,150.00 Backer board, 90 sq ft at $6.50: $585.00 Wall tile labor, 90 sq ft at $24.00: $2,160.00 Total so far: $3,895.00 Tell me what else goes in. Nothing goes to the client until you tap Send.

More on what to trust AI with and what to keep for yourself: AI contractor estimates. To see the whole flow, how it works.

Short on time? Paste your walkthrough notes into the free quote maker and get a quote PDF with the lines and a deposit schedule, no sign-up. The bathroom quoting guide has the step-by-step.

What's the margin on a job like this?

Check before you send. A calculator tells you in ten seconds what your markup leaves you: the markup and margin calculator. The profit margin guide shows what remodelers report keeping. Small jobs hide losses in the details.

For a look at the whole office side, see Nailed as an AI office manager, or the pricing. Sibling template: kitchen remodel estimate.

Frequently asked questions

Should waterproofing be its own line?

Yes. It's work the client can't see once the tile is up, and it's the part that fails expensively. A separate line shows you priced it, and it stops the client from trimming it out when they trim the budget.

Who pays for upgrades beyond the tile allowance?

The client, by written change order, before you order the tile. The allowance sets the material price per square foot. If they pick something above it, the difference times the square footage goes on a signed change.

How do you handle an unknown subfloor?

Say so in the estimate. Price the job assuming the subfloor is sound, list subfloor repair as an exclusion, and give a unit price for repair (per sheet or per square foot) so the client knows the cost before you open it.

Do I include plumbing fixtures or does the owner supply them?

Either works. Write which one. If you supply them, use an allowance. If the owner supplies them, price the install only, and say you're not responsible for a fixture that arrives damaged or wrong.

How long is the estimate good for?

Put a date on it. 14 to 30 days is common, since tile, glass and fixture prices change. After the date, the price needs a refresh before it can be signed.