Skip to content

Templates

Roofing Estimate Template With a Filled Example (Free)

By Roy, Founder of Nailed. Published . 7 min read.

Nailed writes the quote from a voice note you send from the truck. Try it free

This is a roofing estimate for contractors: priced by the square, with every layer of the job on its own line. Copy the template, then check the filled 26-square example, where every total and every draw adds up to the cent. Prefer a spreadsheet? Download the example as a CSV. It has the formulas, so change a quantity and the total follows.

What goes into a roofing estimate?

Everything on the roof, layer by layer: tear-off, protection at the eaves and valleys, underlayment, edge metal, the shingles, ridge, flashing and vents. Then the paper around it: permit, dumpster, exclusions, payment schedule, how changes work, how long the price holds.

A clean category list:

  • Permit and dumpster
  • Tear-off (number of layers)
  • Ice and water protection at eaves and valleys
  • Underlayment
  • Drip edge
  • Shingles, supply and install
  • Ridge cap and ridge vent
  • Pipe boots and flashing
  • Decking replacement, by the sheet
  • Cleanup and magnet sweep

Most of the dollars sit in tear-off and shingles. Most of the arguments sit in flashing and decking.

Copy-paste roofing estimate template

Roofing estimate (copy and fill in)

ESTIMATE #[number]

Date: [date] Valid until: [date, 14 to 30 days out] Contractor: [business name, phone, license # if your state requires one] Client: [name] Job address: [address]

SCOPE OF WORK [Roof measures [ ] squares, [ ] layers to remove, pitch [ ]. Shingle: [maker, line, color]. What comes off, what goes on.]

LINE ITEMS Item | Qty | Unit | Unit price | Amount Permit and dumpster | [1] | LS | $[ ] | $[ ] Tear-off, [1] layer | [ ] | sq | $[ ] | $[ ] Ice and water shield, eaves and valleys | [ ] | sq | $[ ] | $[ ] Synthetic underlayment | [ ] | sq | $[ ] | $[ ] Drip edge | [ ] | lf | $[ ] | $[ ] Shingles, supply and install (waste included) | [ ] | sq | $[ ] | $[ ] Ridge cap | [ ] | lf | $[ ] | $[ ] Pipe boots | [ ] | ea | $[ ] | $[ ] Chimney and wall flashing | [1] | LS | $[ ] | $[ ] Ridge vent | [ ] | lf | $[ ] | $[ ] Decking replacement (ALLOWANCE) | [ ] | sheet | $[ ] | $[ ] Cleanup and magnet sweep | [1] | LS | $[ ] | $[ ] TOTAL: $[ ]

DECKING Rotten or damaged decking found after tear-off is replaced at $[ ] per sheet. The allowance above covers [ ] sheets. Anything over is added by written change order, with a photo, before the work. Unused allowance is credited.

EXCLUSIONS (not in this price) Structural repairs to rafters or trusses. Skylight replacement. Gutters. Siding or fascia repair. Interior water damage. Mold. Anything not listed above.

PERMITS [Included as a line above / the owner pulls the permit / not required in this jurisdiction.]

PAYMENT SCHEDULE 10% at signing: $[ ] 40% when the old roof is off and the new roof is dried in: $[ ] Balance at completion: $[ ]

CHANGES Any change to scope, price or schedule is agreed in writing, signed by both sides, before the work starts.

This estimate is good until [date]. It becomes a contract when both sides sign below.

Client: ______________________ Date: ________ Contractor: __________________ Date: ________

Need wording for a change, like extra decking? Use the change order template. For the full contract language, see the construction proposal template.

What does a filled-in roofing estimate look like?

A single-story house, 26 squares of roof surface, one layer of old shingles, architectural shingles on top. These are made-up numbers to show the layout and the math. They are not a price guide, so use your own rates.

ItemQtyUnitUnit priceAmount
Permit and dumpster1LS$780.00$780.00
Tear-off, 1 layer26sq$62.00$1,612.00
Ice and water shield, eaves and valleys3sq$95.00$285.00
Synthetic underlayment23sq$34.00$782.00
Drip edge190lf$4.25$807.50
Architectural shingles, supply and install28sq$295.00$8,260.00
Ridge cap48lf$9.50$456.00
Pipe boots4ea$85.00$340.00
Chimney flashing1LS$420.00$420.00
Ridge vent40lf$11.00$440.00
Decking replacement (ALLOWANCE, 6 sheets)6sheet$95.00$570.00
Cleanup and magnet sweep1LS$250.00$250.00
Total$15,002.50

Check two: 190 lf of drip edge at $4.25 is $807.50. 28 squares of shingles at $295.00 is $8,260.00. The twelve lines add to $15,002.50.

Why 28 squares of shingles on a 26-square roof? Two extra for waste, starter and cuts. Why 3 plus 23 on the underlayment? The ice and water shield covers 3 squares at the eaves and valleys, and the synthetic covers the other 23. Together that's the 26. Put those two sentences on your own estimate and nobody asks.

How do you price decking you can't see?

Carry a small allowance, or leave decking out of the base and give a price per sheet. Either way, write the rule before you tear off. In the example, six sheets are in the price at $95.00 each. If tear-off turns up ten bad sheets, four more go on a change order at $95.00, which is $380.00, with a photo first.

What should you leave out of the price, and say so?

Anything under or around the roof that you didn't price. A short list that covers most re-roofs:

  • Rafter, truss or other structural repair
  • Skylight replacement
  • Gutters, fascia and siding repair
  • Water damage or mold inside the house
  • Anything not on the line items

An exclusion only helps you if the client saw it before they signed. Point at it when you hand over the estimate.

How should you split the payments on a roof?

Roofs are short jobs, so three draws is plenty. This example uses 10 percent at signing, 40 percent when the roof is dried in, and the remainder at completion, on the $15,002.50 total:

DrawWhenAmount
1At signing (10%)$1,500.25
2Old roof off, new roof dried in (40%)$6,001.00
3Completion (remainder)$7,501.25
Total$15,002.50

Several states cap the deposit a contractor can take, so check your own rules before you set the first draw. More schedules are in the contractor payment schedule template.

How do you send it so it gets signed?

On a phone, as a link. Nobody wants to print, sign and scan a PDF. A tap-to-sign link gets read the same day.

Nailed works this way today. You send a voice note and Nailed drafts the quote, you read it and tap send, and your client gets an email with a signing link. The AI doesn't do the math. The prices are yours and the totals come from code. Made-up numbers again.

Nailed on WhatsApp
  1. You: Voice note (0:28): Roof for the Brennans. 26 squares, one layer. Tear-off 62 a square. Shingles 28 squares at 295. Six sheets of decking as an allowance, 95 a sheet.
  2. Nailed: Got it. Draft quote, Brennan roof: Tear-off, 26 sq at $62.00: $1,612.00 Shingles, 28 sq at $295.00: $8,260.00 Decking (ALLOWANCE), 6 sheets at $95.00: $570.00 Total so far: $10,442.00 What's next? Tap Send when it's done, or keep talking.

Nothing reaches the client until you tap send. See how it works, or read about what AI can and can't do on an estimate.

Does the estimate show my markup?

No. Keep it on your cost sheet. Each line the client sees already carries it. Before you send, run the total through the markup and margin calculator. A roof that turns up surprises can eat the margin fast. The profit margin guide shows how.

Want the estimate, the signature and the payment follow-ups handled from your phone? That's what Nailed does for small contractors. Plans are on the pricing page.

Frequently asked questions

What is a roofing square?

One square is 100 square feet of roof surface. A roof that measures 2,600 sf is 26 squares. Shingles, tear-off and underlayment are all priced by the square, so measure the roof surface, not the footprint of the house.

How much waste do I add for shingles?

It depends on the roof. A simple gable wastes little. Hips, valleys and lots of cuts waste more. Add it to the shingle quantity and say so on the estimate, so the client sees why you're billing more squares than the roof measures.

How do I price rotten decking I can't see yet?

Use a unit price per sheet and keep it out of the base total, or carry a small allowance. Either way, say it in writing: any decking replaced is billed at the sheet price, and you'll show a photo first.

Should the estimate name the shingle?

Yes. Name the maker, the line and the color, or the client will assume the best one on the website. If the color isn't picked, make that a condition: the price holds when the color is chosen by a set date.

Do I include the permit and dumpster?

Put them on their own line so the client sees them. Permit rules vary by town and some skip re-roofs, so ask your building department. Dumpster size depends on layers and squares. Both are real costs, so don't bury them in the shingle price.