Copy the sample below, swap in your lines, and send it as a PDF. A good construction estimate has six parts: priced scope lines, allowances, exclusions, a contingency, a payment schedule and a valid-until date. Most templates skip the exclusions, which is where the arguments start.
What should a construction estimate include?
Your company and license info, the client and job address, a one-paragraph scope, priced lines, allowances, exclusions, contingency, the total, a payment schedule, a valid-until date and a signature line. That's the whole page. If it runs past two pages, you're writing a contract.
What does a filled-in estimate look like?
Here is one for a 600 sq ft basement finish. The numbers add up, so you can check them against your own.
[Your Company], License #[____] Estimate #1042, date: November 11, 2026 Valid until: December 11, 2026 Client: [Name], [Address]
SCOPE Finish 600 sq ft of existing basement: frame and insulate walls, rough electrical and plumbing, drywall, paint, flooring, trim and two interior doors.
PRICED WORK
- Demo and site prep ........................ $2,400
- Framing and drywall ....................... $6,800
- Electrical (licensed sub) .................. $3,900
- Plumbing rough-in (licensed sub) ........... $2,600
- Paint, two coats ........................... $2,100
- Trim and two interior doors ................ $3,300 Priced work subtotal ......................... $21,100
ALLOWANCES (actual cost; difference added or credited) 7. Flooring, materials and install ............ $3,200 8. Light fixtures (you choose, we install) ...... $900 Allowances subtotal .......................... $4,100
Subtotal ..................................... $25,200 Contingency, 10% of subtotal ................. $2,520 TOTAL ........................................ $27,720
CONTINGENCY Covers hidden conditions behind the walls. Anything not used is credited on the final payment.
EXCLUDED (not in this price)
- Permit fees
- Egress window or any structural work
- Mold, asbestos or lead testing and removal
- Appliances, furniture, window treatments
- Moving or storing the client's belongings
- Any work not listed under Scope
PAYMENT SCHEDULE 25% deposit at signing ....................... $6,930 30% when rough-in passes inspection .......... $8,316 30% when drywall is hung ..................... $8,316 15% on completion and signed walkthrough ..... $4,158 Total ........................................ $27,720
CHANGES Anything outside this scope is priced and signed before the work starts. The price changes only by a written change.
Accepted: ____________________ Date: ________ [Your name], [Company]
Check the math. Priced work is 2,400 + 6,800 + 3,900 + 2,600 + 2,100 + 3,300 = $21,100. Allowances add $4,100, so the subtotal is $25,200. Ten percent contingency is $2,520, which makes the total $27,720. The four payments (25, 30, 30, 15 percent) come to $6,930, $8,316, $8,316 and $4,158, and those add back to $27,720 exactly. If a split doesn't land on whole dollars, put the leftover on the last payment.
What's the difference between an allowance and a contingency?
An allowance is a known item with an unknown price, like flooring the client hasn't picked. A contingency is money for things nobody can see yet, like a rotted sill. Allowances get trued up to actual cost. Contingency is spent only if something shows up.
| Allowance | Contingency | |
|---|---|---|
| What it covers | A choice not made yet | A surprise |
| Who triggers it | The client's selection | The job site |
| If you spend less | Credit the difference | Credit what's unused |
| If you spend more | Add the difference | Written change, or you eat it |
| Where it sits | A line in the scope | Its own row |
Say "price if over" in plain words. "Flooring allowance $3,200. If the client picks something that costs $4,000, we add $800." Don't make anyone guess.
How do I list exclusions on an estimate?
Write them as a short list under their own heading, in the same plain language as the scope. Name the things clients most often assume are included: permits, testing, cleanup beyond normal, appliances, anything structural. Finish with "any work not listed under Scope."
Think of the last time a client said "I thought that was included." That sentence goes on the list. Nobody reads exclusions on the day you send the estimate. Everybody remembers them on week three.
How much contingency should I add?
Ten percent is what this sample uses. It is not a rule. Newer homes with open walls need less. A 1950s house where you can't see behind the plaster might need more. The honest move is to show it as a line and say what happens to the unused part.
You can bury it inside your prices instead. That works, but then you can't credit anything back, and when the surprise comes you have the same conversation anyway. Showing it makes the change-order talk shorter.
Is a high total the same as a good margin?
No. A $27,720 total says nothing about what you keep. Run the check before you send. If your cost on the $25,200 subtotal is $19,600, your margin is (25,200 - 19,600) / 25,200 = 22.2 percent. To hold 25 percent on that same cost, the subtotal has to be $26,133. Use the markup and margin calculator so you don't mix up the two, and look at what a healthy GC margin is before you pick a number. If you haven't worked out your overhead, start there, because a margin on top of a wrong cost is still wrong.
How would this look when Nailed builds it from a voice note?
You describe the job in a voice note. Nailed turns it into a branded quote with your lines, a deposit and a payment schedule. It waits for your tap before anything goes to the client, and the code does the math, not the AI. The client signs from a link. No login.
- You: Voice note: basement finish at the Hendersons, 600 feet. Demo 2,400, framing and drywall 6,800, electrical 3,900, plumbing 2,600, paint 2,100, trim and doors 3,300. Flooring allowance 3,200, fixtures 900. Ten percent contingency. Twenty five down, then thirty thirty fifteen.
- Nailed: Draft quote for Henderson, basement finish: priced work $21,100, allowances $4,100, contingency $2,520, total $27,720. Deposit $6,930 at signing, then $8,316, $8,316 and $4,158. Want me to send it?
- You: Add that permits are excluded
- Nailed: Added to the exclusions. Tap to send it to the Hendersons for signature.
If you want the full version of that flow, see how it works, the AI office manager for contractors and the AI quote generator for contractors.
Prefer not to retype your notes? Paste them into the free quote maker and get a quote PDF with the lines and a deposit schedule, no sign-up. More options in the free estimate generator guide.
Which estimate template fits my trade?
This page is the generic one. If you do mostly one kind of work, start from the trade version, which has the right line items already:
For a longer document with terms, use the construction proposal template. Not sure whether you should call it an estimate, quote or bid? Read estimate vs quote vs bid vs proposal. When the owner wants to change the scope later, see how to price a change order. A contract question, such as holdbacks or what counts as a change, is one for a local attorney, since rules differ by state. Unsure of a term? The contractor glossary has it.
After you send it, use the quote follow-up messages if you do not hear back. For getting the client's yes in writing, see e-signatures on construction contracts.
Frequently asked questions
Should a construction estimate be in Excel or Word?
Neither matters to the client. They want a clear total, what's in it and what's not. Excel is easier if you reuse line items and check sums. Word is easier for long scope notes. Whatever you pick, send a PDF, not the editable file.
How long should an estimate be valid?
Thirty days is plenty. Shorter if lumber, copper or roofing material prices are moving. Put the actual date on the page, not 'valid for 30 days', so nobody argues about when the clock started.
What's the difference between an estimate and a bid?
An estimate is your price for the work as scoped. A bid usually answers someone else's drawings and scope, often against other bidders. The wording in your state or contract may differ, so say plainly on the page whether the number is fixed. The estimate vs quote vs bid guide goes through it.
Do I put my markup on the estimate?
Most small GCs show a price per line and keep markup inside it. Cost-plus jobs are the exception, where the markup is its own line the client agreed to. Either way, check your margin before you send. Dollars of markup are not dollars of profit.