Residential Remodel Scope of Work Template (Free, Filled In)
Nailed writes the quote from a voice note you send from the truck. Try it free
Copy the template below, fill in the brackets, and attach it to the quote before the client signs. Most templates skip two things: an exclusions list, and one closing sentence. Anything not listed is a change order.
That sentence makes a change order easy to ask for. The client agreed to it in writing, so you're not springing a charge on anyone. You're pointing at page two.
What is a scope of work for a remodel?
A scope of work is the written list of what you'll build, with what materials, and what you won't do. It sits next to the price. The price says how much, the scope says for what. When a client says "I thought that was included," the scope is your answer.
Why do exclusions matter most?
Exclusions are what a reasonable client might assume is part of the job, and isn't. Painting after tile. Moving furniture. The rotted subfloor nobody can see yet. Say them on day zero and each one is a short, calm conversation later, not a bill that feels like a surprise.
Three habits help:
- List the usual surprises for the trade: hidden rot, old wiring, lead or asbestos in older homes, code upgrades the inspector asks for.
- Write "client supplies" or "contractor supplies" next to every fixture.
- End with a catch-all: anything not listed is a change order, priced and signed before the work starts.
What goes in a remodel scope of work?
Ten parts, in this order. Keep each one to a line or two.
SCOPE OF WORK Job: [Bathroom remodel / Kitchen refresh / etc.] Address: [job address] Client: [client name] Contractor: [your company name, license no.] Date: [date] Attached to: [Quote / Contract no. and date]
-
WORK AREA [Room(s) and what is being done. Example: Hall bathroom, about 5 x 8 ft. Full gut and rebuild.]
-
DEMOLITION AND DISPOSAL [What comes out. Who hauls it. Example: Remove tub, tile, vanity, toilet, flooring. Contractor hauls debris.]
-
WORK INCLUDED [One line per task, with materials and size.
- Task: [what], [material/brand/size]
- Task: [what], [material/brand/size]
- Task: [what], [material/brand/size]]
-
MATERIALS AND WHO SUPPLIES THEM [Item | Contractor supplies / Client supplies | Allowance if any]
-
ALLOWANCES [Item: $[amount] covers [what]. If the final choice costs more, the client pays the difference. If it costs less, the client gets the credit.]
-
EXCLUSIONS (NOT INCLUDED)
- [Painting beyond the room named above]
- [Moving or storing furniture and belongings]
- [Repair of hidden damage: rot, mold, old wiring, failed framing]
- [Permit fees, unless listed above]
- [Work outside the work area: other rooms, exterior, HVAC]
- [Anything else for this job: ____ ]
-
ACCESS AND SITE [Working hours, parking, water or power the client provides, pets, who is home.]
-
SCHEDULE [Start date or window. Estimated duration. Note that dates move for weather, material delays and client changes.]
-
CLEAN-UP AND FINISH [What "done" looks like. Example: Broom-clean daily, final clean at completion, walkthrough with the client.]
-
CHANGES Anything not listed under Work Included is not part of this price. Any addition, removal or substitution is a change order. We write it up with the cost and schedule effect, and the client signs it before that work starts.
Client signature: ______________ Date: ______ Contractor signature: __________ Date: ______
What does a filled-in example look like?
Here's the template filled in for a small hall bathroom. The numbers are made up, so don't use them as a price guide. The arithmetic does add up.
Hall bathroom, about 5 x 8 ft. Full gut and rebuild.
Work included
- Remove tub, wall tile, vanity, toilet and flooring. Contractor hauls debris.
- Set a new 60-inch alcove tub. Waterproof the tub walls, tile to 7 ft.
- Tile the floor.
- Install vanity, faucet, toilet, mirror and towel bar.
- Replace the exhaust fan and two light fixtures. Rough and finish electrical for those items only.
- Prime and paint the bathroom walls and ceiling, two coats.
Who supplies what
| Item | Supplied by | Allowance |
|---|---|---|
| Wall and floor tile | Contractor | $1,800 |
| Vanity and top | Contractor | $900 |
| Tub, toilet, faucet | Contractor | Included |
| Mirror, towel bar | Client | None |
Exclusions
- Repair of rot, mold or damaged framing found after demolition.
- Painting outside the bathroom.
- Moving items out of the adjacent hall closet.
- Permit fees.
- Any work in the attic, crawl space or other rooms.
Price
| Line | Amount |
|---|---|
| Demolition and haul-away | $1,200 |
| Plumbing, rough and finish | $2,600 |
| Tile and waterproofing labor | $4,100 |
| Fixture install and carpentry | $1,900 |
| Electrical | $900 |
| Paint | $600 |
| Tile allowance | $1,800 |
| Vanity allowance | $900 |
| Total | $14,000 |
The lines add up: 1,200 + 2,600 + 4,100 + 1,900 + 900 + 600 = 11,300, and the two allowances add 2,700. Total 14,000.
Now the client picks a $2,300 tile. That's $500 over the $1,800 allowance. The rule is already in the scope, so the $500 isn't a debate. It's a line on a change order.
And when demo opens the floor and the subfloor is soft? Exclusion number one. Stop, photograph it, price the repair, get it signed.
How do I turn a scope violation into a change order?
When something outside the scope comes up, stop that piece of work and name it in one line. Quote the cost and the days. Get a yes in writing before you start. The change order template has the exact wording, and how to get change orders signed covers the timing.
Where does the scope sit in the quote?
Put it right behind the price, on the same signed document, or attach it and reference it by name. The construction proposal template shows where a scope fits in a full proposal. If your quote is one page, the scope can be a second page the client initials.
How do I write this from a phone?
If you'd rather talk than type, Nailed turns a voice note into a branded quote the client e-signs from a link, with the deposit and payment schedule on it. Allowances can be marked on the quote. Nothing goes to the client until you tap. Read the draft for your exclusions before you send it, and add them if they're missing. Nailed doesn't do takeoffs from plans, so the scope content is yours.
- You: Quote the Alvarez hall bath. Gut and rebuild, 14 thousand, 30 percent down. Tile allowance 1,800, vanity 900.
- Nailed: Quote ready: Alvarez hall bath, $14,000.00, deposit $4,200.00. Tile and vanity are marked as allowances. Send it?
- You: Send
More on that flow is on the AI office manager for contractors page, and plans are on pricing.
Related
Frequently asked questions
How detailed should a scope of work be?
Detailed enough that a stranger could read it and tell whether a request is in or out. Name the room, the materials, who supplies them and what you will not touch. If you can't tell by reading it whether something is included, add a line.
Is a scope of work the same as a contract?
No. The scope says what work gets done. The contract adds price, payment schedule, dates, insurance and legal terms. Most small GCs attach the scope to the contract or the signed quote so the client signs both at once.
What is an allowance in a scope of work?
A set dollar amount for something the client hasn't picked yet, like tile or a vanity. If they choose above it, they pay the difference. If they choose below it, they get the credit. Write the amount and what it covers.
Do I need exclusions if the scope is already detailed?
Yes. A list of what is included can never be complete. A short list of what is not included, plus the sentence that anything unlisted is a change order, closes the gap before it turns into an argument.